Tender released seeking operator for French port terminal

The project will be split into three phases - the first phase will include dedicated quay with a draft of 11.3 metres, the second phase will have a quay level of 8 hectares and the third phase will include the installation of two stations with a dedicated quay of 12 metres.

Blurred image of IJGlobal article content
Blurred image of IJGlobal article related content