Gaz de France and Singapore Power form LNG JV

The terminal will be built on a 30 hectare site on Jurong Island in the industrial southwest corner of the country. It is scheduled to be operational in 2012, with an initial capacity of 3 million tonnes per annum.

Blurred image of IJGlobal article content
Blurred image of IJGlobal article related content