Fortum to build €80m CHP plant in Estonia

The plant, which will produce 45MW of heat and 23MW of electricity, will be fuelled with local biomass and peat. It is slated to be operational by the end of 2010.

Blurred image of IJGlobal article content
Blurred image of IJGlobal article related content