PPA signed for Unit Two of Raft River geothermal facility
The PPA allows for variable electrical output up to a maximum of 16MW with a term of 25 years.
Existing Subscriber?
If you are an existing subscriber please sign in to read this article in full.
Sign InSign up for a free trial
Register for free access to IJGlobal and realise the value of our asset and transaction databases, our market leading news, league tables and much more.
Sign up for a free trial