East China (Jiangsu) power transmission project

For ease of transmission line construction, operation and maintenance, the Bidders are encouraged to bid for above-mentioned sub-packages together, but the quotation shall be made on the basis of each sub-package, and each sub-package shall be packed and submitted separately

Blurred image of IJGlobal article content
Blurred image of IJGlobal article related content